Skip to content
  • Offers
  • Case Studies
  • How It Works
  • Contact
Margaux Systems
Offers Case Studies How It Works Contact

← Home

Case Studies

Capacity Expansion Analysis — Scenario Study

A manufacturing scenario evaluates two capacity investment strategies using constraint-based scheduling and counterfactual analysis.

Fulfillment Centre Bottleneck Analysis

A fulfillment centre tests express prioritisation, machine maintenance windows, and throughput limits using constraint-based scheduling to find what really drives delays.

Movie Production Scheduling: Cutting a Shoot from 179 Days to 65

One actor was the bottleneck. The difference between the best and worst schedule was 114 shooting days and $8.5 million.

Margaux Systems

© 2026 Margaux Systems