Case Studies
Capacity Expansion Analysis — Scenario Study
A manufacturing scenario evaluates two capacity investment strategies using constraint-based scheduling and counterfactual analysis.
Fulfillment Centre Bottleneck Analysis
A fulfillment centre tests express prioritisation, machine maintenance windows, and throughput limits using constraint-based scheduling to find what really drives delays.
Movie Production Scheduling: Cutting a Shoot from 179 Days to 65
One actor was the bottleneck. The difference between the best and worst schedule was 114 shooting days and $8.5 million.